ANALISIS JUMLAH SPARE AUXILIARY POWER UNIT APS3200 UNTUK ARMADA PT XYZ BERDASARKAN JUMLAH PESAWAT AIRBUS A320 – 200

Authors

  • Radhix anang wahyudi Universitas Dirgantara Marsekal Suryadarma
  • Ayu Martina Universitas Dirgantara Marsekal Suryadarma
  • Freddy Franciscus Universitas Dirgantara Marsekal Suryadarma

DOI:

https://doi.org/10.35894/jmd.v5i1.126

Keywords:

Auxiliary Power Unit APS3200, MTBUR, Weibull, Poisson, Airbus A320 – 200., Auxiliary Power Unit

Abstract

The Auxiliary Power Unit (APU) is a crucial component in commercial aircraft operations, primarily providing electrical power when the aircraft is not in operation. This study aims to determine the Mean Time Between Unscheduled Removal (MTBUR) of the APS3200 APU, estimate annual demand, and analyze the optimal spare quantity based on the fleet size of airline XYZ. The research methodology employs Weibull survival analysis using Minitab software to calculate MTBUR. Additionally, the estimation of spare unit requirements is based on MTBUR, annual demand, and re-supply time. The results indicate that the MTBUR of the APS3200 APU is 4,800 hours with a reliability level above 60%. Based on annual demand analysis, the recommended quantity for a fleet of 20 aircraft is 2 units per year. Furthermore, the recommended spare APU quantity varies depending on fleet size: 2 units for 20–30 aircraft, 3 units for 40–50 aircraft, 4 units for 60 aircraft, 5 units for 70–80 aircraft, and 6 units for 90 aircraft. These calculations allow airlines to optimize APU availability, enhance operational efficiency, ensure fleet reliability, and manage costs effectively within the aviation industry.

References

Kementrian Perhubungan Republik Indonesia, 2006, Definitions and Abbreaviations, part 1

Amendmen 1

Pengantar Penerbangan Perspektif, Hutagaol Desmond, 2013, Profesional, Erlangga, Jakarta.

Kiinniison, H.A., 2004, Aviation Maintenance Management. The Mcgraw – Hall Companies,

Inc., America.

Corder, A., 1992, Teknik Manajemen Pemeliharaan, Penerbit Erlangga, Jakarta.

Prasetyo, A., 2011, Document Perawatan Pesawat Terbang http://www.ilmuterbang.com,

diakses pada tanggal 5 April 2024.

Setiawan, F., Taaqbier, M., & Anhar, M. (2022). Perencanaan Preventive Maintenance

Menggunakan Metode Reliability Pada Electrical Sistem Auxiliary Power Unit Boeing 737-

Injection: Indonesian Journal of Vocational Mechanical Engineering, 2(1), 1-8.

https://www.aeroexpo.online/prod/pratt-whitney/product-170325-49701.html, diakses pada

tanggal 5 April 2024.

_____. (2021). Technical Training Manual Auxiliary Power Unit 131-9A.Honeywell.

Daulay, I. N., Nurutami, S. S., & Daniel, D. D. (2013). Analisis Maintenance Reliability

Terhadap MTBF (Mean Time Between Failures) Facilities Pada Industri Pulp & Paper. Jurnal

Ekonomi, 21(04).

Dwi iPriyatna. i(2000). iKeandalan idan iPerawatan. iJurusan iTeknik iPerkapalan. iInstitut

iTeknologi iSepuluh iNovember iSurabaya. iJurnal iTeknik, i4(3).

Setiawan, iF., iSofyan, iE., i& iPutra, iD. iM. iC. i(2020). iAnalisis iReliability iSistem iStarter

iValve iUntuk iMerencanakan iAktivitas iMaintenance iPada iPesawat iBoeing i737 iNext

iGeneration idi iPT iGMF iAeroasia. iTeknika iSTTKD: iJurnal iTeknik, iElektronik, iEngine,

i6(2), i92-103.

Otaya, L. G. (2016). Distribusi Probabilitas Weibull dan Aplikasinya Pada Persoalan

Keandalan (Reliability) dan Analisis Rawatan (Mantainability). Tadbir: Jurnal Manajemen

Pendidikan Islam, 4(2), 44-66.

Ryan, B. F., Joiner, B. L., & Cryer, J. D. (2012). Minitab Handbook: Update for Release 16.

Brooks/Cole.

Montgomery, D. C. (2019). Introduction to Statistical Quality Control (8th ed.). Wiley.

Antony, J. (2003). Six Sigma for Process Improvement: A Practical Guide to Statistical Tools

and Techniques. Routledge.

Airbus, 2015, Mathematical Model Part 3, Integrated Provisioning Services Airbus

Setiawan, F., Sofyan, E., & Romadhon, F. (2021). Analisis Efektivitas Turn Around Time

dengan Metode Critical Path Method pada Aktivitas Perawatan C05-Check Pesawat Airbus

-200. Teknika STTKD: Jurnal Teknik, Elektronik, Engine, 7(1), 50-63.

PW_3200_MFTM_ePub_PW.pdf

Downloads

Published

2026-06-30